Notifications · Central / All India
GRAP Stage III construction restrictions in Delhi-NCR
CAQM invoked GRAP Stage III across Delhi-NCR on 6 November 2026. Construction teams must check which dust-generating activities to pause and when exemptions apply.
- Jurisdiction
- Central / All India
- Effective from
- 06 November 2026
- Issued on
- 06 November 2026
- Status
- Current
- Reference
- 120017/27/GRAP/2021/CAQM
State-wise library
Check another state or UT
Move directly to the published notifications records for a jurisdiction.
Official circular
Reference details
Use the official reference, date, jurisdiction and effective period below before implementation.
| Reference number | 120017/27/GRAP/2021/CAQM |
|---|---|
| Issue date | 06 Nov 2026 |
| Effective date / period | 06 Nov 2026 |
| Jurisdiction | Central / All India |
| Issuing authority | Commission for Air Quality Management in NCR and Adjoining Areas |
| Subject | Notice / Circular |
| Status | Current |
Circular summary
What the circular says
What CAQM ordered
On 6 November 2026 the Commission for Air Quality Management (CAQM) invoked GRAP Stage III across the National Capital Region with immediate effect. Stage I and Stage II measures continued alongside it. Delhi’s daily AQI was 382 when the decision was taken. Forecasts of severe air quality prompted the early invocation. The order applies to covered NCR areas, including Delhi and designated districts of Haryana, Uttar Pradesh and Rajasthan.
Which construction work is restricted
Action 1 of the revised schedule restricts dust-generating work such as excavation, drilling, piling, demolition, open-trench utility work, masonry, ready-mix concrete batching, major welding or gas cutting, specified surface work, major road works and handling dusty material. Minor indoor repair exceptions are limited to the activities specified in the schedule. Minor mechanical, electrical and plumbing welding and pothole repairs are also expressly permitted. Other lower-dust work may continue subject to waste-management rules, dust controls and applicable directions.
The schedule permits specified work for rail and metro, airports and interstate bus terminals, certain defence and nationally important projects, healthcare facilities, qualifying linear public infrastructure and sanitation or water projects. Qualifying ancillary work can also be covered. These permissions are conditional on compliance with applicable waste, dust and CAQM requirements.
What employers and contractors should do
Map each scheduled activity to the order and keep a written record of tasks paused, tasks allowed and the basis for any exemption. Brief subcontractors and site supervisors before allocating shifts, deliveries or equipment. Maintain dust-control records for permitted work and check the applicable district or pollution-control directions. These are environmental controls on site operations. Review workforce scheduling and labour obligations separately. Check subsequent CAQM directions and any site-specific closure notice before resuming restricted work.
Sources and related guidance
Employer reference
Implementation notes
Employer impact: Pause listed dust-generating work unless the project meets an express exception. Keep dust controls in place for permitted work and check local directions. · Action required: Review each activity and site, notify contractors in writing, keep evidence of any exception and check for fresh CAQM or local orders before restarting.
Official circular / document
Open the controlling government source.
e93ab81c-af66-4c41-a6b1-41bdd4a8ff28.pdf · Commission for Air Quality Management in NCR and Adjoining Areas
Get compliance updates by email
Choose your states, topics and frequency for gazettes, notifications, minimum wages and new articles. Change your preferences or unsubscribe anytime.
