Minimum Wages · Central Sphere

Central Sphere Stone Mine Piece Rates — October 2026

Central Sphere Stone Mine Piece Rates — October 2026. Effective 2026-10-01. Employment-specific piece rate — quantity shown in each row schedule; notification reference 6/1/2026-VDA.

Jurisdiction
Central Sphere
Effective from
01 October 2026
Issued on
30 September 2026
Status
Current
Reference
6/1/2026-VDA

State-wise library

Check another state or UT

Move directly to the published minimum wages records for a jurisdiction.

At a glance

Notification details

Wage unitPiece rate — quantity shown in each row
Source PDF pages7, 8
Published rows8
Effective from01 October 2026
Issued on30 September 2026
StatusCurrent

Published statutory data

Applicable rates and details

8 published rows. Search by employment, zone, skill or category.

8 of 8 rows shown
Operation / sizeNotified quantity unitBasic (INR/unit)VDA (INR/unit)Total (INR/unit)
Excavation: soft soil2.831 cubic metres (100 cubic feet)351218569
Excavation: soft soil with rock2.831 cubic metres (100 cubic feet)531323854
Excavation: rock2.831 cubic metres (100 cubic feet)7034281131
Removal and stacking of rejected stones2.831 cubic metres (100 cubic feet)283174457
Breaking / crushing: 1 to 1.5 inchesTruck load: 5.662 cubic metres (200 cubic feet)217112973468
Breaking / crushing: above 1.5 to 3 inchesTruck load: 5.662 cubic metres (200 cubic feet)185711092966
Breaking / crushing: above 3 to 5 inchesTruck load: 5.662 cubic metres (200 cubic feet)10886541742
Breaking / crushing: above 5 inchesTruck load: 5.662 cubic metres (200 cubic feet)8935391432

Employer reference

Implementation notes

These are piece rates, not daily wages. The first four rows use the notified 50-metre lead and 1.5-metre lift where specified. Excavation/removal is per 2.831 cubic metres; breaking/crushing is per truck load of 5.662 cubic metres. The order separately preserves the guaranteed time-rate provision linked to unskilled above-ground mine work; read PDF page 8 before applying.

Official document

Check the controlling notification.

6/1/2026-VDA · Labour Bureau, Ministry of Labour and Employment, Government of India

Open source document ↗

Notification and transcription checks

Government-hosted notification. Reviewed on 20 October 2026. The issuing authority, issue date, effective date and wage unit are kept separate.

PDF page 7 · PDF page 8

Reviewed source SHA-256: e43fd12ea747732a979ca7214368491e24e335df598690782f3be1ea7368f778

Published as a reviewed website supplement. ComplianceHub remains authoritative when the corresponding record is published there. Earlier website records remain available in Published history.

↑