Minimum Wages · Central / All India

Central Sphere Stone Mine Piece Rates — October 2026

The October 2026 Central Sphere stone-mines order revises piece rates. Select the operation and measurement unit stated in the signed schedule.

Jurisdiction
Central / All India
Effective from
01 October 2026
Issued on
30 September 2026
Status
Current
Reference
6/1/2026-VDA

State-wise library

Check another state or UT

Move directly to the published minimum wages records for a jurisdiction.

At a glance

Notification details

Published rows8
Reference6/1/2026-VDA
AuthorityLabour Bureau, Ministry of Labour and Employment, Government of India
Effective from01 October 2026
Issued on30 September 2026
StatusCurrent

Published statutory data

Applicable rates and details

8 published rows. Search by employment, zone, skill or category.

8 of 8 rows shown
Scheduled employmentIndustryZoneSkillWorker categoryBasic wageVDATotal wagePeriod
Stone mines———Excavation: soft soil351.0218.0569.0PIECE_RATE
Stone mines———Excavation: soft soil with rock531.0323.0854.0PIECE_RATE
Stone mines———Excavation: rock703.0428.01131.0PIECE_RATE
Stone mines———Removal and stacking of rejected stones283.0174.0457.0PIECE_RATE
Stone mines———Breaking / crushing: 1 to 1.5 inches2171.01297.03468.0PIECE_RATE
Stone mines———Breaking / crushing: above 1.5 to 3 inches1857.01109.02966.0PIECE_RATE
Stone mines———Breaking / crushing: above 3 to 5 inches1088.0654.01742.0PIECE_RATE
Stone mines———Breaking / crushing: above 5 inches893.0539.01432.0PIECE_RATE

Official document

Check the controlling notification.

6/1/2026-VDA · Labour Bureau, Ministry of Labour and Employment, Government of India

Open source document ↗
↑