Notifications · Kerala

Minimum WagesKeralaG.O.(P) No.97/2025/LBR; S.R.O.1214/2025

Kerala cane and bamboo minimum wages: final October 2025 schedule

Final cane and bamboo wage schedule effective 18 October 2025, covering daily and piece work with additional district-CPI DA and specific scope exclusions.

Published / issued: 17 Oct 2025Effective: 18 Oct 2025
Jurisdiction
Kerala
Effective from
18 October 2025
Issued on
17 October 2025
Status
Published
Reference
G.O.(P) No.97/2025/LBR; S.R.O.1214/2025

State-wise library

Check another state or UT

Move directly to the published notifications records for a jurisdiction.

Gazette reference

Notification details

Use the official reference, date, jurisdiction and effective period below before implementation.

Read issuing authority source ↗
Notification numberG.O.(P) No.97/2025/LBR; S.R.O.1214/2025
Notification date17 Oct 2025
Effective date / period18 Oct 2025
JurisdictionKerala
Issuing authorityLabour and Skills (E) Department, Government of Kerala
SubjectMinimum Wages
StatusPublished

Notification summary

What the notification says

Kerala’s final cane and bamboo industry schedule is G.O.(P) No.97/2025/LBR dated 17 October 2025, published as S.R.O.1214/2025 in Gazette No.3703 on 18 October 2025. The notification makes that publication date the effective date.

Selected schedule entries before additional DA

Section / categoryNotified daily wage entry
Reed/bamboo skilled workers₹940
Reed/bamboo assistants, helpers and general workers₹700
Cane skilled workers, excluding furniture manufacture₹940
Cane preparation work / helper / cleaner₹800 / ₹700 / ₹670

The schedule also contains reed-cutting and mat-weaving piece rates with workloads. DA is additional at ₹2.30 per day for each district CPI point above 165 (2011–12=100). Piece workers must satisfy the notification’s output and working-day conditions for DA. These selected entries therefore should not be presented as all-inclusive current wages.

Practical payroll steps

  1. Separate reed/bamboo work from the cane section, which excludes furniture manufacture.
  2. Choose the correct daily or piece-work entry and retain output records.
  3. Calculate DA using the applicable published district index and the notified workload rules.
  4. Preserve higher wages and existing benefits required by the instrument.

Frequently asked questions

Is this the final schedule or the earlier proposal?

It is the final October 2025 notification issued after the draft-consultation process.

Does ₹940 include all DA?

No. The notification provides additional CPI-linked DA.

Can cane furniture production use the cane table shown here?

The cane section expressly excludes furniture manufacture. Identify the correct applicable schedule before calculating wages.

Source documents

Compare other state and sector records in the minimum wages library.

Related compliance references

Official gazette / notification

Open the controlling government source.

G.O.(P) No.97/2025/LBR; S.R.O.1214/2025 · Labour and Skills (E) Department, Government of Kerala

Read issuing authority source ↗
↑