Notifications · Kerala

Minimum WagesKeralaG.O.(P) No.9/2026/LBR; S.R.O.136/2026

Kerala gold and silver ornaments minimum wages: final February 2026 schedule

Final wage schedule for manufacture of gold and silver ornaments, effective 3 February 2026, with occupational groups and process-specific piece rates.

Published / issued: 02 Feb 2026Effective: 03 Feb 2026
Jurisdiction
Kerala
Effective from
03 February 2026
Issued on
02 February 2026
Status
Published
Reference
G.O.(P) No.9/2026/LBR; S.R.O.136/2026

State-wise library

Check another state or UT

Move directly to the published notifications records for a jurisdiction.

Gazette reference

Notification details

Use the official reference, date, jurisdiction and effective period below before implementation.

Read issuing authority source ↗
Notification numberG.O.(P) No.9/2026/LBR; S.R.O.136/2026
Notification date02 Feb 2026
Effective date / period03 Feb 2026
JurisdictionKerala
Issuing authorityLabour and Skills (E) Department, Government of Kerala
SubjectMinimum Wages
StatusPublished

Notification summary

What the notification says

Kerala’s final gold and silver ornaments manufacturing schedule was issued as G.O.(P) No.9/2026/LBR on 2 February 2026. It was published as S.R.O.136/2026 in Gazette No.426 on 3 February 2026, which is the commencement date specified by the instrument.

Sector and wage structure

The notification concerns manufacture of gold and silver ornaments. It replaces the 2016 sector notification and contains occupational groups, time-rated entries and piece-work schedules. The manufacturing scope should be checked before applying it to a retail-only jewellery establishment.

For time-rated workers, the DA clause uses ₹2.30 daily or ₹60 monthly per applicable district CPI point above 165 (2011–12=100). The notification states that its piece rates already include DA, so an additional DA amount must not be added to those entries.

How to use the final schedule

  1. Identify the production process and actual duties, including specialist ornament manufacture, general production, clerical or support work.
  2. Select the applicable group and wage unit in the full schedule.
  3. For piece work, record the exact process, quantity and unit used in the Gazette instead of converting it into a generic daily wage.
  4. Apply the notification’s allowance and other conditions, and keep the calculation with payroll records.

This page preserves the final notification and its original dates. The linked Gazette is the reference for the complete process-specific schedule; this article does not claim a single all-inclusive current wage for the sector.

Frequently asked questions

When did the final manufacturing schedule start?

It takes effect from Gazette publication on 3 February 2026.

Does the notification cover every jewellery sales outlet?

Its stated scope is manufacture of gold and silver ornaments. Check the establishment’s actual activity and any separate applicable schedule.

Why are there no imported total-wage slabs here?

The instrument contains several occupational and piece-work entries with conditions. A complete current-total matrix has not been independently reconstructed.

Source documents

Compare other state and sector records in the minimum wages library.

Related compliance references

Official gazette / notification

Open the controlling government source.

G.O.(P) No.9/2026/LBR; S.R.O.136/2026 · Labour and Skills (E) Department, Government of Kerala

Read issuing authority source ↗
↑