Published rows8
Reference1/4(7)/2022-LS-II
AuthorityChief Labour Commissioner (Central)
Effective from01 April 2022
Effective to30 September 2022
Issued on29 July 2022
StatusHistorical
Published statutory data
Applicable rates and details
| Scheduled employment | Industry | Zone | Skill | Worker category | Basic wage | VDA | Total wage | Period |
|---|---|---|---|---|---|---|---|---|
| Stone mines | — | — | — | Excavation and removal - soft soil | 351.0 | 119.0 | 470.0 | PIECE_RATE |
| Stone mines | — | — | — | Excavation and removal - soft soil with rock | 531.0 | 175.0 | 706.0 | PIECE_RATE |
| Stone mines | — | — | — | Excavation and removal - rock | 703.0 | 231.0 | 934.0 | PIECE_RATE |
| Stone mines | — | — | — | Removal and stacking of rejected stones | 283.0 | 94.0 | 377.0 | PIECE_RATE |
| Stone mines | — | — | — | Stone breaking or crushing - 1.0 to 1.5 inches | 2171.0 | 701.0 | 2872.0 | PIECE_RATE |
| Stone mines | — | — | — | Stone breaking or crushing - above 1.5 to 3.0 inches | 1857.0 | 600.0 | 2457.0 | PIECE_RATE |
| Stone mines | — | — | — | Stone breaking or crushing - above 3.0 to 5.0 inches | 1088.0 | 354.0 | 1442.0 | PIECE_RATE |
| Stone mines | — | — | — | Stone breaking or crushing - above 5.0 inches | 893.0 | 292.0 | 1185.0 | PIECE_RATE |
Official document
Check the controlling notification.
1/4(7)/2022-LS-II · Chief Labour Commissioner (Central)
